Muchea Rec Centre Playground - Design (Closed)
Posted: 26/02/2024 Closing Date: 15/03/2024 12:00 PM
The Shire of Chittering is currently seeking comments on the design of the new playground to be installed at the Muchea Recreation Centre.
The design scope was to create a playground which was accessible for all, and to suit the 0-12 year old demographic. The playground will be located adjacent to the new function centre and includes:
- climbing, sliding, general movement, and musical components
- fencing to all sides
- permanent shade structure
- rubber soft fall flooring
Funding is currently being sought to complete the project, and community feedback on the design is requested to ensure we meet the needs of all community members.
Further information is available from Alison Reliti, Community Development Coordinator on 08 9576 4645.
Submissions are due by 12pm on Thursday 15 March and can be delivered to:
Attn: Melinda Prinsloo, Chief Executive Officer
In person: Shire Administration Building, 6177 Great Northern Highway, Bindoon
email: chatter@chittering.wa.gov.au